Energy audit of 1.3 million square foot manufacturing facility resulting in 40% ($1.4 million) operating cost reduction with 4 month payback. Savings resulted from revisions to heating systems, replacement of existing lighting to high efficiency lamps and electronic ballasts with motion detection control, and modulation of plant compressed air system to better match actual load.