Design-Aire Engineering

Indianapolis Engineers - Mechanical • Electrical • Plumbing • Energy

  • Facebook
  • Instagram
  • Linked In
  • Home
  • About DAE
    • Professional Engineering Licenses
    • Careers
  • Projects
  • Services
    • Engineering
    • Energy
    • Green
  • Publications
  • Contact

Paige’s Music Headquarters (Fishers, IN) New Facility


51,200 SF                     New Construction


Paige’s Music sought to relocate its headquarters from Indianapolis to Fishers, IN. The new facility measures approximately 51,200 SF and ~24′ Clearance Height. DAE provided mechanical (HVAC) Construction Design/Documents for the new headquarters. Building uses included: Office(s), Retail Space, a Repair Workshop and Warehouse; as well as a forklift Charging Station that required a special Emergency Exhaust system.  Provided services included calculating heating and cooling loads (based 72 degrees in the summer and 68 degrees in the winter; with a year-round relative humidity of 40-45%). This included single-zone packaged rooftop units (RTU’s), general exhaust fans, specific exhaust fans for areas such as Lacquering and Buffing as required by code, and equipment around overhead doors to limit the influence of infiltration.

 

Daviess County – Cross Dock Warehouse

Cross Dock Warehouse – Daviess County

DAE designed lighting, heating, ventilation and air-conditioning (HVAC) systems for Daviess County warehouse facility in Washington, Indiana.

Daviess County wanted to install energy efficient lighting, HVAC and building envelope systems at their new maintenance and warehouse facility.  Daviess County wanted a lighting level of at least 35 foot-candles and uniform space (heating) temperatures.

DAE recommended (74) T5 fluorescent (6 lamp) lighting and (1) 1,250 MBtuh air rotation unit to illuminate and provide space heating.  DAE design will provide light levels of 40 foot-candles with a +/-2 F temperature difference between floor and ceiling.  ARU use high velocity fans to circulate stratified air at the ceiling back to the floor and thereby recovering heat from lighting.  The air rotation unit fans will also provide free cooling in the spring and fall.

Daviess County requested DAE provided construction management during equipment installation.

Daviess County’s new HVAC system will reduce heating costs by 15% and reduce cooling costs by 10% compared to standard efficiency air-conditioning units.

Office Locations

Indianapolis
2707 Rand Rd.
Indianapolis, IN 46241
Office: (317) 464-9090

Washington, DC/Alexandria
301 Franklin St. - Suite 2
Alexandria, VA 22314
Office: (703) 419-3349

Toll Free: (866) 515-9090
Fax: (317) 464-9393
Contact Us
Today!
  • Home
  • About DAE
    • Careers
  • Services
  • Contact
Indianapolise Web Design