Project Profiles - Industrial

Aluminum Finishing Corporation

Indianapolis, Indiana

DAE assisted the owner in obtaining VOC discharge permit through the Environmental Protection Agency for an industrial painting operation. Emissions were reduced, from in excess of 25 tons VOC’s per year to approaching zero, by application of a recuperative thermal oxidizer designed by DAE

Marico Oil

Indianapolis, Indiana

DAE was responsible for mechanical and electrical modifications to the cookie production line. This included pneumatic controls and improvements to the HVAC system.

Citizens Gas & Coke

Citizen's Gas logo

Indianapolis, Indiana

Design-Aire Engineering has completed several projects at Citizens Gas & Coke. This includes mechanical design for renovation to the dust collection system, hot water heater design, an acoustical study and solution to hopper house sound problem.

Naval Avionics Center

Indianapolis, Indiana

Mechanical design of a Class 100 clean room, providing an ultra-clean air environment required for photographic processing. This project involved the interface with existing utilities and production schedules while meeting tight budget limitations.

Wavetek, Inc.

Wavetek, Inc., located in Indianapolis

Indianapolis, Indiana

At this industrial facility, design of the HVAC and exhaust was completed for the production plating and Class 1,000 clean room. Due to the depth of the plating tanks, the design required a unique push-pull exhaust technique to contain acid and caustic fumes.

DuPont DeNemours & Company

Louisville, Kentucky

DAE was responsible for HVAC renovation and detailed cost estimate of this 100% outside air ventilated quality control laboratory.

Heritage Transport Center/MicroNutrients

Indianapolis, Indiana

Design-Aire completed HVAC design for this transportation maintenance facility and a subsequent design of a chemical recycling plant.

A.E. Staley

A.E. Staley plant., located in Lafayette

Lafayette, Indiana

HVAC design for office and laboratory renovation of this corn production plant. This included control of outside air with an air quality sensor which reduced contamination inside the facility, solving a serious health danger to laboratory workers.